Client challenge
Each of the facility's four lines ran its own standalone HMI with no shared historian, making cross-line trend analysis and centralized alarm response impossible for the control room.
PLC · HMI · SCADA / Rockwell · GE · Keyence
Realistic sample engagement: consolidated four independently monitored blending and filling lines into a single plant-wide SCADA system with unified historian and alarm management.
4
Lines consolidated
0 hrs
Unplanned downtime during cutover
−38%
Alarm count
Each of the facility's four lines ran its own standalone HMI with no shared historian, making cross-line trend analysis and centralized alarm response impossible for the control room.
Designed and deployed a redundant FactoryTalk SE SCADA architecture polling all four lines, with a unified alarm philosophy and a consolidated historian for plant-wide reporting.